← All Iowa Facilities

Iowa Facility 5

Large-scale Bitcoin mining hosting built to meet institutional demand at scale.

MiningStore Iowa Mining Facility 5
8 MW
Total Capacity
2,600+
Miner Slots
SPP
Power Market

About This Facility

MiningStore's fifth Iowa facility was developed as a high-capacity expansion to serve rising demand for institutional-grade Bitcoin mining. With 8 MW of total capacity and more than 2,600 miner slots, Facility 5 stands as one of the largest sites in our Iowa portfolio, purpose-built to accommodate large allocations from family offices, private equity firms, and institutional investors.

Now fully allocated, Facility 5 reflects both the strength of institutional appetite and MiningStore's ability to deliver enterprise-scale infrastructure in the U.S.

Facility Highlights

  • Capacity: 8 MW total
  • Miner Slots: 2,600+ ASIC-ready positions
  • Grid Power: Connected to the SPP market for competitive energy economics
  • Scale: Designed to support concentrated large deployments under one roof
  • Status: Fully deployed and allocated

Inside Facility 5

Facility 5 was designed to prioritize capacity, density, and operational resilience, making it an ideal solution for large-scale investors looking to consolidate operations. At 8 MW and 2,600+ slots, it provides the scale necessary to support institutional allocations within a single facility, reducing operational fragmentation and simplifying portfolio oversight.

By expanding within the SPP grid, Facility 5 builds on MiningStore's expertise in leveraging renewable-heavy energy markets with dynamic pricing windows, passing cost benefits directly to clients.

Why It Matters

The rapid allocation of every slot at Facility 5 demonstrates the continued institutional appetite for U.S.-based Bitcoin mining infrastructure and MiningStore's reputation as a trusted operator. Iowa's combination of low-cost SPP power, statewide property tax exemptions for industrial equipment, and federal accelerated depreciation make it an ideal location for multi-megawatt capital deployments.

While Facility 5 is fully allocated, new capacity is in development. MiningStore continues to expand with builds designed to match institutional requirements for capacity, transparency, and ESG alignment.

Interested in Iowa Facility 5?

This 8 MW SPP-market facility is currently full. Talk to our team about waitlist or other Iowa facilities.