← All Iowa Facilities

Iowa Facility 5

Large-scale Bitcoin mining hosting built to meet institutional demand at scale.

MiningStore Iowa Mining Facility 5
8 MW
Total Capacity
2,600+
Miner Slots
SPP
Power Market

About This Facility

MiningStore's fifth Iowa facility was developed as a high-capacity expansion to serve rising demand for institutional-grade Bitcoin mining. With 8 MW of total capacity and more than 2,600 miner slots, Facility 5 stands as one of the largest sites in our Iowa portfolio, purpose-built to accommodate large allocations from family offices, private equity firms, and institutional investors.

Now fully allocated, Facility 5 reflects both the strength of institutional appetite and MiningStore's ability to deliver enterprise-scale infrastructure in the U.S.

Facility Highlights

  • Capacity: 8 MW total
  • Miner Slots: 2,600+ ASIC-ready positions
  • Grid Power: Connected to the SPP market for competitive energy economics
  • Scale: Designed to support concentrated large deployments under one roof
  • Status: Fully deployed and allocated

Inside Facility 5

Facility 5 was designed to prioritize capacity, density, and operational resilience, making it an ideal solution for large-scale investors looking to consolidate operations. At 8 MW and 2,600+ slots, it provides the scale necessary to support institutional allocations within a single facility, reducing operational fragmentation and simplifying portfolio oversight.

By expanding within the SPP grid, Facility 5 builds on MiningStore's expertise in leveraging renewable-heavy energy markets with dynamic pricing windows, passing cost benefits directly to clients.

Why It Matters

The rapid allocation of every slot at Facility 5 demonstrates the continued institutional appetite for U.S.-based Bitcoin mining infrastructure and MiningStore's reputation as a trusted operator. Iowa's combination of low-cost SPP power, statewide property tax exemptions for industrial equipment, and federal accelerated depreciation make it an ideal location for multi-megawatt capital deployments.

While Facility 5 is fully allocated, new capacity is in development. MiningStore continues to expand with builds designed to match institutional requirements for capacity, transparency, and ESG alignment.

Interested in Iowa Facility 5?

This 8 MW SPP-market facility is currently full. Talk to our team about waitlist or other Iowa facilities.

Get the guide

Tell us where to send it.

We'll email you occasional mining insights and you can unsubscribe from any message. We never sell your details.