← All Iowa Facilities Under Development — Q2 2026

Iowa Facility 11 — Immersion

A dedicated 3.5 MW immersion-cooled Bitcoin mining facility coming online in Q2 2026, optimized for the next generation of high-density ASIC hardware.

MiningStore Iowa Mining Facility 11
3.5 MW
Total Capacity
1,000+
Immersion Slots
MISO
Power Market

Why Immersion Cooling?

Immersion cooling submerges ASIC miners in dielectric fluid, enabling significantly higher hashrates per machine, dramatically lower noise, longer hardware lifespan, and the ability to host the latest hydro-class machines without dedicated water-cooling loops. By transferring heat directly into the fluid instead of relying on air, immersion eliminates hotspots, allows aggressive overclocking, and protects boards from dust, humidity, and thermal cycling — the three biggest drivers of ASIC failure in air-cooled fleets.

For institutional operators, this translates into more terahash per kilowatt, longer asset lives, quieter facilities, and a clear path to deploying the next generation of high-density miners that air cooling simply cannot support. Facility 11 is being purpose-built around this approach from day one.

About This Facility

Facility 11 is a 3.5 MW Bitcoin mining facility under development in Iowa's MISO power market, with operational launch targeted for Q2 2026. The site is engineered as a 100% immersion-cooled deployment, with 1,000+ immersion-ready slots and modular expansion capability built around MiningStore's proven operational blueprint refined across 10,000+ deployed miners.

The facility connects directly to the MISO wholesale market, where our team manages facility energy procurement and demand response operations. Iowa's natural climate advantages — moderate temperatures, low humidity, and four-season operating conditions — combine with immersion's thermal efficiency to extend hardware lifespan and reduce operating costs.

Why Iowa's MISO Grid

Iowa ranks #1 in the U.S. for wind energy as a percentage of state generation, with abundant renewable supply, long-term power contracts, and a stable regulatory environment for energy-intensive infrastructure. MISO market access enables both wholesale procurement and demand response participation, creating a flexible cost structure that supports long-term mining economics. Combined with Iowa's central geography, fiber connectivity, and established data center workforce, it is one of the most institution-ready Bitcoin mining locations in North America.

Built for Institutional Operators

Facility 11 is purpose-built for family offices, funds, and large allocators that require institutional-grade infrastructure: redundant electrical distribution, 24/7 monitoring with real-time performance dashboards, video surveillance, access control, transparent reporting, and direct manufacturer relationships for warranty and technical support. With over 180 active investor clients and seven operational facilities already running across Iowa, MiningStore brings proven operational discipline to every new site.

Hosting and Flex Mining Service Terms

Hosting

You choose your machines, mining pool, and payout wallet. Our technicians apply your settings and provide hosting and management support.

You pay a monthly invoice for hosting and management services. You provide a service deposit of up to two months of service fees, as your agreement requires.

Your mining pool pays your wallet. MiningStore does not collect your hosting revenue.

Flex Mining

You own the miners. MiningStore chooses the pool and manages the fleet and payouts.

We deduct monthly service fees and agreed costs from mining revenue, then apply the profit split in your agreement. You provide no service deposit for Flex Mining.

We hold mining funds for you during the month. At month-end, we settle fees and agreed costs and pay your share of that month's mining rewards.

Book a Flex Mining consultation if you own miners rated 15–22.5 J/TH or plan to acquire them.

Book a Flex Mining consultation

We confirm monthly service fees, any setup or repair charges, deposit terms, and the Flex profit split in your quote and agreement.

Compare Hosting and Flex Mining

Reserve Capacity in Iowa Facility 11

Our dedicated immersion facility opens Q2 2026. Reserve hosting capacity now to lock in availability for the next generation of high-density ASIC miners.

Get the guide

Tell us where to send it.

We'll email you occasional mining insights and you can unsubscribe from any message. We never sell your details.