← All Iowa Facilities Live & Running

Iowa Facility 9

A 6 MW institutional Bitcoin mining facility on the SPP grid, built for verifiable performance and long-term hold.

MiningStore Iowa Mining Facility 9
6 MW
Total Capacity
2,100+
Miner Slots
SPP
Power Market

About This Facility

Facility 9 is a 6 MW Bitcoin mining site in Iowa with a direct interconnect to the Southwest Power Pool (SPP). The building holds 2,100+ ASIC miner slots and runs for institutional clients today.

The site extends our record of standing up mining infrastructure in the corners of North America with the most stable grid economics.

Facility Highlights

  • Capacity: 6 MW of contracted industrial power
  • Miner Slots: 2,100+ ASIC-ready positions under one roof
  • Power Market: Direct SPP interconnect, with the basis between day-ahead and real-time passed back to the client
  • Cooling: Air-cooled, tuned for density and miner longevity
  • Operations: On-site technicians and 24/7 monitoring
  • Status: Live, with per-machine reporting for institutional clients

Why Iowa's SPP Market

Iowa became a hub for institutional Bitcoin mining because the grid is dense, the renewable mix is high, and the regulatory climate stays predictable across administrations. For long-horizon mining capital, the state offers some of the most favorable conditions in North America.

  • SPP Energy Arbitrage: A direct SPP interconnect prices power against a deep, renewable-rich wholesale market instead of a flat utility rate.
  • Renewable Energy Leadership: Iowa runs near the top of U.S. states for wind generation; Facility 9 draws from that mix.
  • Grid Flexibility: Mining loads provide demand-response capacity to the grid and earn revenue against surplus renewable generation.
  • Property Tax Exemption: Iowa's statewide exemption on industrial machinery removes recurring property tax on the ASIC asset base.
  • Jurisdictional Stability: A predictable regulatory climate makes a multi-year capital deployment easier to defend.

Built for Institutional Investors

Facility 9 is built to the operational standards private equity firms, family offices, and high-net-worth investors apply to any infrastructure position they underwrite. Long-term energy contracts, per-machine reporting, and a layered risk framework give institutional partners enough underwriting comfort to size up.

Data center power keeps getting scarcer. Hosting capacity at a site with locked-in energy and a running operations team is a defensible position in the compute infrastructure race.

Hosting and Flex Mining Service Terms

Hosting

You choose your machines, mining pool, and payout wallet. Our technicians apply your settings and provide hosting and management support.

You pay a monthly invoice for hosting and management services. You provide a service deposit of up to two months of service fees, as your agreement requires.

Your mining pool pays your wallet. MiningStore does not collect your hosting revenue.

Flex Mining

You own the miners. MiningStore chooses the pool and manages the fleet and payouts.

We deduct monthly service fees and agreed costs from mining revenue, then apply the profit split in your agreement. You provide no service deposit for Flex Mining.

We hold mining funds for you during the month. At month-end, we settle fees and agreed costs and pay your share of that month's mining rewards.

Book a Flex Mining consultation if you own miners rated 15–22.5 J/TH or plan to acquire them.

Book a Flex Mining consultation

We confirm monthly service fees, any setup or repair charges, deposit terms, and the Flex profit split in your quote and agreement.

Compare Hosting and Flex Mining

Interested in Iowa Facility 9?

This 6 MW SPP-market facility is fully operational. Talk to our team about hosting availability.

Get the guide

Tell us where to send it.

We'll email you occasional mining insights and you can unsubscribe from any message. We never sell your details.