Iowa Facility 2
Proven operations, upgraded for hybrid hosting. A 5 MW Iowa site running air miners since 2022 and hydro miners since 2025, on the MISO grid.
Status: Fully deployed and at capacity. Talk to our team about waitlist availability or other Iowa sites.
Expanding Institutional Access to Bitcoin Mining
MiningStore's second Iowa facility was developed to meet rising investor demand for institutional-grade Bitcoin mining hosting. Operations began with air miners in July 2022, demonstrating stability and performance from day one. In August 2025, the site expanded to host hydro-cooled miners, cementing its role as a hybrid facility capable of supporting both technologies.
With 5 MW of power, over 1,200 slots, and connectivity to the MISO grid, Facility 2 combines operational history with cutting-edge infrastructure, offering investors the reassurance of proven results and the upside of future-ready efficiency.
Facility Highlights
- Operations: Air mining since July 2022; hydro mining since August 2025
- Capacity: 5 MW total
- Miner Slots: 1,200+ ASIC-ready positions
- Grid Power: Connected to the MISO market, leveraging renewable-rich, competitive pricing
- Cooling Options: Supports both air-cooled and hydro-cooled miners
- Status: Fully deployed and at capacity
Inside Facility 2
Facility 2 was designed as a flexible hosting environment that has evolved to match the latest hardware and investor expectations.
- Proven reliability: More than three years of continuous air-mining operations
- Hydro-ready upgrades: Integrated in 2025, enabling deployment of high-density hydro ASICs for maximum efficiency
- Hybrid layouts: Optimized airflow for air miners; advanced liquid-cooling for hydro units
- Institutional oversight: On-site technicians M-F during business hours, monitoring, and preventive maintenance to maintain uptime
- Security and resilience: Redundant systems, access-controlled halls, and comprehensive surveillance
- Transparency: Investors receive real-time reporting that mirrors on-site metrics
Why Facility 2 Matters
Operational Track Record
Unlike speculative or new builds, Facility 2 has been proven since 2022 with continuous air-mining operations. This track record provides institutional investors with confidence that the infrastructure delivers consistent results.
Hybrid Capability
The 2025 hydro expansion ensures the facility can host the most advanced ASICs on the market. Investors can choose between air miners for proven stability or hydro miners for peak efficiency and density, all within one future-ready site.
MISO Market Advantage
By operating in the MISO grid, Facility 2 benefits from one of the U.S.'s most dynamic energy markets. With abundant wind and solar, pricing windows often create significant cost advantages, supporting long-term ROI.
The Iowa Advantage: A Strategic Base
For investors, location is paramount to long-term margin protection. Iowa provides a unique nexus of stability, low-cost power, and a favorable regulatory climate that minimizes risk and maximizes cash flow.
Optimized Energy Procurement
Operating within the MISO market provides access to one of the U.S.'s most dynamic energy grids. This enables sophisticated power purchasing that captures significant cost advantages from abundant regional wind and solar generation.
Grid Resilience and Reliability
The state offers a stable regulatory environment and reliable infrastructure, evidenced by Facility 2's continuous operational track record since 2022. This stability is critical for the long-term deployment of large capital assets.
Decoupled Property Risk
The strategic value of this location is further amplified by the local tax environment, which explicitly exempts industrial machinery from property taxes.
Looking Ahead
Though Facility 2 is fully allocated, its hybrid model showcases what institutional investors can expect from MiningStore: reliable operations with the flexibility to adopt next-generation mining technologies.
Whether your allocation is $65K or multi-megawatt scale, our team provides the infrastructure, expertise, and reporting you need to execute a long-term Bitcoin strategy with confidence.
Interested in Iowa Facility 2?
This 5 MW facility is fully allocated. Talk to our team about waitlist availability or other Iowa facilities.