# MiningStore: 62.5 MW Bitcoin Mining in Iowa

> MiningStore operates 11 fully deployed Bitcoin mining facilities with 62.5 MW capacity across Iowa's most competitive energy markets.

Canonical: https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/
Last updated: 2026-11-12

11 fully deployed Iowa facilities. 62.5 MW of operating capacity inside the two deepest wholesale power markets in North America.

## Built and Operating, Not Pitched and Promised

Our 62.5 MW network is live across 11 facilities inside MISO and SPP, two of the deepest wholesale power markets in North America. Reliable hashrate, transparent operations, tax-optimized returns.

## The Numbers That Matter

Bitcoin mining has moved from a speculative venture into institutional-grade digital infrastructure. For an investor in 2026, the operator picking up the phone matters more than the white paper.

62.5 MW

Operational capacity across 11 facilities

11

Fully deployed facilities in Iowa

9+

Years of profitable operations

## Infrastructure Built for the Next Decade

Each facility takes years of energy market analysis, site selection, and engineering. We deploy miners and we build the long-lived infrastructure behind them.

## Why Iowa Matters for Investors

### Competitive Energy Markets

Facilities sit inside the [MISO](<https://www.misoenergy.org/markets-and-operations/>) and [SPP](<https://www.spp.org/markets-operations/>) wholesale power markets. Industrial pricing with deep liquidity and stable grid operations behind it.

### Scalable Infrastructure

Facility sizes run from 400 to 3,600+ miner slots, so a fleet can scale across sites without renegotiating the operations contract.

### Tax-Optimized Returns

Mining equipment qualifies for bonus depreciation under [IRS Publication 946 (§168(k))](<https://www.irs.gov/publications/p946>), which moves a large share of the purchase to year-one expense and lifts the after-tax yield.

### Institutional-Grade Operations

24/7 monitoring, on-site maintenance, transparent reporting, and a Customer Success team that picks up the phone.

## Our Facilities

Our Iowa footprint runs inside the two deepest wholesale power markets in the country, with facilities from 2.5 MW to 10 MW. Ten sites are live today; a dedicated immersion-cooled facility goes online in Q2 2026.

- [Iowa Facility 1](<https://miningstore.com/bitcoin-hosting/iowa-facility-1/>) - 7.5 MW -- Grid Power, SPP Market

- [Iowa Facility 2](<https://miningstore.com/bitcoin-hosting/iowa-facility-2/>) - 5 MW -- Grid Power, MISO Market

- [Iowa Facility 3](<https://miningstore.com/bitcoin-hosting/iowa-facility-3/>) - 5 MW -- Grid Power, SPP Market

- [Iowa Facility 4](<https://miningstore.com/bitcoin-hosting/iowa-facility-4/>) - 5.2 MW -- Grid Power, SPP Market

- [Iowa Facility 5](<https://miningstore.com/bitcoin-hosting/iowa-facility-5/>) - 8 MW -- Grid Power, SPP Market

- [Iowa Facility 6](<https://miningstore.com/bitcoin-hosting/iowa-facility-6/>) - 2.5 MW -- Grid Power, MISO Market

- [Iowa Facility 7](<https://miningstore.com/bitcoin-hosting/iowa-facility-7/>) - 10 MW -- Grid Power, MISO Market

- [Iowa Facility 8](<https://miningstore.com/bitcoin-hosting/iowa-bitcoin-mining-hosting-facility-8/>) - 5 MW -- Grid Power, MISO Market

- [Iowa Facility 9](<https://miningstore.com/bitcoin-hosting/facility-9-institutional-bitcoin-mining-iowa/>) - 6 MW -- Grid Power, SPP Market

- [Iowa Facility 10](<https://miningstore.com/bitcoin-hosting/iowa-bitcoin-mining-hosting-facility-10/>) - 5 MW -- Grid Power, SPP Market

- [Iowa Facility 11](<https://miningstore.com/bitcoin-hosting/iowa-facility-11/>) - 3.5 MW -- Grid Power, MISO Market

## Your Ideal Partner

At MiningStore, we work with individuals, funds, and institutions to build hosting strategies that scale, perform, and align with your long-term goals.

### Flex Mining

**Best for:** Investors seeking turnkey Bitcoin exposure

**Structure:** Full equipment ownership, MiningStore operational management

**Benefits:** Tax depreciation, direct Bitcoin revenue, transparent reporting

### Hosting Services

**Best for:** Bitcoin mining operators needing reliable, scalable infrastructure

**Structure:** Bring your own hardware or procure through us

**Benefits:** Low-cost power, 24/7 monitoring, professional maintenance

## 62.5 MW and Counting

From pioneering our first 7.5 MW Iowa facility to our bleeding-edge 10 MW facility, every location is selected for long-term operational excellence and energy market advantage.

## Sources & References

MiningStore publishes the third-party data sources behind the claims on this page so operators, investors, and researchers can verify every figure against primary reporting.

1. [MISO Markets & Operations — Integrated Marketplace Overview](<https://www.misoenergy.org/markets-and-operations/>)  — Midcontinent Independent System Operator (MISO)

2. [Southwest Power Pool — Markets Operations](<https://www.spp.org/markets-operations/>)  — Southwest Power Pool (SPP)

3. [Publication 946: How to Depreciate Property (Section 168(k) Bonus Depreciation)](<https://www.irs.gov/publications/p946>)  — U.S. Internal Revenue Service

## Hosting and Flex Mining Service Terms

### Hosting

You choose your machines, mining pool, and payout wallet. Our technicians apply your settings and provide hosting and management support.

You pay a monthly invoice for hosting and management services. You provide a service deposit of up to two months of service fees, as your agreement requires.

Your mining pool pays your wallet. MiningStore does not collect your hosting revenue.

### Flex Mining

You own the miners. MiningStore chooses the pool and manages the fleet and payouts.

We deduct monthly service fees and agreed costs from mining revenue, then apply the profit split in your agreement. You provide no service deposit for Flex Mining.

We hold mining funds for you during the month. At month-end, we settle fees and agreed costs and pay your share of that month's mining rewards.

Book a Flex Mining consultation if you own miners rated 15–22.5 J/TH or plan to acquire them.

 [Book a Flex Mining consultation](<https://miningstore.com/contact/?topic=flex&from=%2Fminingstore-62-5-mw-bitcoin-mining-in-iowa%2F#book-call>)

We confirm monthly service fees, any setup or repair charges, deposit terms, and the Flex profit split in your quote and agreement.

 [Compare Hosting and Flex Mining](<https://miningstore.com/#compare-programs>)

## Related
- [Iowa Facility 1](<https://miningstore.com/bitcoin-hosting/iowa-facility-1/>)
- [Iowa Facility 2](<https://miningstore.com/bitcoin-hosting/iowa-facility-2/>)
- [Iowa Facility 3](<https://miningstore.com/bitcoin-hosting/iowa-facility-3/>)
- [Iowa Facility 4](<https://miningstore.com/bitcoin-hosting/iowa-facility-4/>)
- [Iowa Facility 5](<https://miningstore.com/bitcoin-hosting/iowa-facility-5/>)
