Amarillo Project

50MW digital currency mining operation

PROJECT SUMMARY

Aurum Capital Ventures is seeking a $18M investment to construct a 50MW digital currency mining operation at a source of very low-cost stranded wind power in Gruver, Texas. Load studies, preliminary engineering, and design work have already been completed and the project is ready to begin construction immediately.

EXPERTISE THROUGH EXPERIENCE

Aurum Capital Ventures

$ 700K

2017 Revenue

$ 2.2M

2018 Revenue

$ 7M

2019 Revenue

AURUM’ S

PROPOSITION

aurum ties together several unique advantages
MINING EQUIPMENT
Aurum will utilize its access to the most efficient mining servers not generally available without strategic relationships.
DEBT FINANCING
Due to Texas' extremely low-cost power, Aurum has successfully secured financing for up to 15,000 Bitcoin mining servers.
LOW-COST ENERGY
Through a combination of electrical grid access and a fixed power contract, energy will be supplied under $25/MWh in TX.
EXIT STRATEGY
Aurum has established a high-margin funnel enabling the company to off-load hashrate into retail marketplaces.

Advantage 1

ENERGY COSTS

Aurum is among 5% of miners with access to electricity below 2.5 cents/kwh. Aurum's cost to mine a Bitcoin is approximately $10,841 in Texas as of 2021 BTC price & difficulty.

Advantage 2

DEBT FINANCING

Aurum has been seeking debt financing for miners since 2016. Over the past 6-months a few private lenders in the crypto industry have begun offering reasonable terms to long-standing miners with power rates at or below $25/MWh to fit their risk tolerance. Aurum has secured multiple financing offers, not available to most miners, due to Texas power rate and the company's deep history and credibility within the space.

Advantage 3

EXIT STRATEGY

In mid-2017, S9 bitcoin miners were purchased for an average of $2000 per machine. At the end of 2017, these same machines were sold for an average of $6,500 - an increase of 325%. We call this increased demand and profitability The Supply Gap wherein fabricators can not keep up with the demand for hashrate. This presents an opportunity to offload hashrate into the market at very healthy markups. Aurum capitalizes on this event with our subsidiary brand, MiningStore.com – a dominant player in the retail mining space.

STATE-OF-THE-ART MINING

Preliminary engineering and design work have been completed

INVESTMENT OPTIONS

Aurum is currently advancing the development of the Amarillo Project and seeking additional partners

MINIMUM INVESTMENT - $500,000

Equity Investor

Purchase 276,923 shares of Aurum common stock at $65/share to cover infrastructure build out. Estimated stock valuation following the Texas development is $185.67/share X 276,923 shares = $51,416,293 plus upside on future strategic plans of Aurum.

Project Partner

Provide $18 million in capital financing and receive 50% share of net cash flow from the project. Cash flow estimated at $10 million in year one; $57 million in year two; and $123 million in year three for an estimated annual IRR of approximately 148% pre-tax.

DOWNLOAD AMARILLO SLIDE DECK

SCHEDULE A DEMO

Schedule A Demo toady and Aurum Capital Ventures will spend time giving you detailed insight to the Amarillo Project Offering

DISCLAIMER

This is not a solicitation to buy or an offer to sell interest in Aurum Capital Ventures (parent company of MiningStore LLC) or any of its funds. Such offers will be made only by distribution of a private placement offering memorandum and related documents (Offering Documents) and only in compliance with applicable law. The materials provided, including, without limitation, news articles, informational materials and all other Aurum-specific information, have been prepared for informational purposes only and do not constitute financial, legal, tax or any other advice. All information contained herein is provided "as is" and Aurum Capital Ventures expressly disclaims making any express or implied warranties with respect to the fitness of the information contained herein for any particular usage, its merchantability or its application or purpose. Before making any investment, an investor should thoroughly review the Offering Documents with the investor's financial, legal and tax advisor to determine whether an investment in a fund or program facilitated by or through Aurum Capital Ventures is suitable for the investor in light of the investor's investment objectives, financial circumstances and tax situation.