# Iowa Facility 8 — 5 MW Hydro-Only Bitcoin Mining

> Iowa Facility 8 is a live 5 MW MiningStore hydro-only site on the MISO grid with 800+ hydro-cooled ASIC slots, renewable power, and institutional-grade uptime.

Canonical: https://miningstore.com/bitcoin-hosting/iowa-bitcoin-mining-hosting-facility-8/
Last updated: 2026-11-12

[← All Iowa Facilities](<https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/>) Live & Running

## Iowa Facility 8

A 5 MW hydro-only, institutional-grade Bitcoin mining facility on Iowa's MISO grid, built for efficient hydro-cooled ASIC deployment and long-term, low-cost hashrate.

5 MW

Total Capacity

800+

Miner Slots

MISO

Power Market

## About This Facility

Facility 8 is a fully deployed 5 MW MiningStore **hydro-only** site located in Iowa and connected to the MISO power market. The facility hosts more than 800 hydro-cooled ASIC miner slots in a modular design that prioritizes operational uptime, equipment longevity, and transparent reporting for institutional clients.

Iowa's position within the MISO grid gives Facility 8 access to a deep pool of low-cost generation, including significant wind and other renewable resources. Our team uses this grid mix to manage site operating costs. Clients pay a monthly invoice for hosting and management services.

The site runs to traditional data center standards: redundant electrical infrastructure, environmental controls tuned for ASIC longevity, 24/7 monitoring, and on-site remote hands. Clients get the operational rigor of an institutional mining platform without having to build or staff their own facility.

## Why Iowa & the MISO Grid

Iowa is one of the most strategic regions in North America for Bitcoin mining. It combines abundant generation capacity, a high renewable share, and a transparent wholesale market through MISO. For hosted miners, that means stable pricing, room to scale, and a power mix that supports ESG-aware allocation.

Facility 8 takes advantage of all three: low blended energy cost, deep grid capacity for future expansion, and a renewable-heavy fuel mix that reduces the carbon intensity of every TH/s produced on site.

## Built for Institutional Hydro Mining

Facility 8 is engineered as institutional hydro infrastructure, not a retail-style mining shed. The 5 MW hydro-only build uses a modular layout that supports the latest generation of high-efficiency hydro-cooled ASICs, with dielectric fluid cooling, power distribution, and maintenance access designed around long equipment life and high availability.

MiningStore manages the full operational stack: deployment, firmware tuning, performance monitoring, repairs, and client reporting. Hosted clients receive transparent uptime, hashrate, and revenue data, with the same operational discipline applied across our broader North American facility portfolio.

## Facility Highlights

- **Capacity:** 5 MW

- **Cooling:** Hydro-only — purpose-built for hydro-cooled ASICs

- **Miner Slots:** 800+ hydro-cooled positions

- **Grid Power:** MISO market — renewable-rich, competitively priced

- **Status:** Live and running

## Hosting and Flex Mining Service Terms

### Hosting

You choose your machines, mining pool, and payout wallet. Our technicians apply your settings and provide hosting and management support.

You pay a monthly invoice for hosting and management services. You provide a service deposit of up to two months of service fees, as your agreement requires.

Your mining pool pays your wallet. MiningStore does not collect your hosting revenue.

### Flex Mining

You own the miners. MiningStore chooses the pool and manages the fleet and payouts.

We deduct monthly service fees and agreed costs from mining revenue, then apply the profit split in your agreement. You provide no service deposit for Flex Mining.

We hold mining funds for you during the month. At month-end, we settle fees and agreed costs and pay your share of that month's mining rewards.

Book a Flex Mining consultation if you own miners rated 15–22.5 J/TH or plan to acquire them.

 [Book a Flex Mining consultation](<https://miningstore.com/contact/?topic=flex&from=%2Fbitcoin-hosting%2Fiowa-bitcoin-mining-hosting-facility-8%2F#book-call>)

We confirm monthly service fees, any setup or repair charges, deposit terms, and the Flex profit split in your quote and agreement.

 [Compare Hosting and Flex Mining](<https://miningstore.com/#compare-programs>)

## Related
- [← All Iowa Facilities](<https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/>)
- [Book a Flex Mining consultation](<https://miningstore.com/contact/>)
- [Compare Hosting and Flex Mining](<https://miningstore.com/>)
